stockyard venues and carriageways must be ground treatment and surface hardening, and meet the requirements of heavy vehicles; site should drainage facilities, drainage flow, no significant accumulation of water or crater phenomena. Site field view.
2013年8月7日星期三
three drum dryer installation
1. Installation and assembly of technical requirements: First, dust and clearance equipment parts inventory, Concrete Mixing Truck damage caused during transport, such as found to be missing padded.
2. In accordance with the position of the base outline dimensions and anchor bolts for concrete foundation, foundation is placed horizontally on the ground, its elevation may refer artwork can also be the root user's actual situation dig their own determination.
3. Install anchor bolts shall regulate the construction and mechanical engineering construction and acceptance.
4. Roller device installation and assembly requirements:
a, in support Zhi roller device wedged between plate and foundation wedges, used to adjust the level and support Zhi plate height.
b, cross the center line of the bottom roller design position with a deviation not greater than 1.5mm, and the two bearing steel cement silo the parallel lines, their parallelism no larger than 0.5mm..
c, four roller Simplified centerline parallel to the centerline, which shall not be greater than the parallelism ± 0.1 mm / m.
5. Rotary Simplified installation, the deviation shall not exceed the following value
a, two bands face runout shall not exceed 1.2mm
b, two with runout shall not exceed 1 mm