mixing station with


1, sidewalk driving speed: 24 km / h to 24 km round-trip transportation distance calculation example.
2, concrete mixer truck loading time: HZS120 Machine 1/6 hours / car, HZS90 machine 7/30 / hour.
3, concrete mixer truck unloading time: 5 minutes.
4, each completed a vehicle steel cement silo  HZS120 machine needs 1.25 hours, HZS90 machine needs 1.32 hours.
5,6 hours can deliver car number: HZS120 machine 6 × 1/1.25 ≈ 5 (car), HZS90 machine 6 × 1/1.32 ≈ 4 (cars).
6,6 hours to complete watering concrete beam 320 m, the number of necessary transportation vehicles: 320 × 1/6.5 ≈ 50 (car).
7, concrete mixer truck with sidewalk transportation should be considered as leave some empty rate. HZS120 mixer stand, host a capacity of 1.5 m, suitable Concrete mixing plant with 9 m in order to install four material. Transport distance is about 12KM, 6 hours to complete watering concrete beam 320 m, with 10 to 11 should be concrete mixer truck.
8, HZS90 mixer station hosts a capacity of 1.5 m, should be equipped with 8 m concrete mixer truck for loading 5 material. HZS90 + HZS120 stand mixer, preferably with 8 m concrete mixer truck for loading 4 material. Transport distance 12KM, 6 hours to complete watering concrete beam 320 m, should be equipped with 13 to 14 units concrete mixer truck.