Maintenance mixing station


When the site inaccessible, maintenance personnel need to spend a lot of time and out of the site, the best choice with the same smaller size of the two aircraft stations, or prepare enough spare parts to ensure the smooth construction progress.
Screw Conveyor construction to a more decentralized, but not too far distance between the site, concrete mixer truck transporting a radius of not more than half an hour, dump trucks transporting no more than 10 minutes. Best use of multi No. concentrated agitation to improve the utilization of mixing station and construction cost.
Operating personnel quality; Generally, concrete block making machine structure is relatively simple, the control system is also relatively simple, so the operation and maintenance personnel requirements are lower. While the larger station complex structure, high degree of automation, so the operator's requirements are also higher. So when you buy in addition to considering mixing station in front of several factors, should consider this factor.

没有评论:

发表评论