stockyard venues and carriageways must be ground treatment and surface hardening, and meet the requirements of heavy vehicles; site should drainage facilities, drainage flow, no significant accumulation of water or crater phenomena. Site field view.
2013年8月15日星期四
Conveyor Performs necessary cleanup materials
Clogging many reasons, mainly to prevent clogging may take the following measures:
Entering the conveyor materials for the necessary cleanup, to prevent large complex or fibrous impurities into the machine causing blockage. Install hopper and clogging material level sensor, concrete block making machine and alarm. Increase the spout or lengthen trough ends to address poor or too late nesting nesting problem. Cement silo, also in the material outlet chute ends a short anti-rotation vanes mounted to prevent blocking material ends.
In attempts to prevent the discharge opening of a valve cover plate. Blockage occurs because the accumulation of materials, open the top attempts to prevent the door limit switch through the same intercept power. Minimize the transverse dimension of the intermediate hanger bearings to reduce the material through the intermediate bearing blocking material when possible. Reasonable choice of the technical parameters, such as slow speed can not be too large. Strict implementation of control procedures, so that no load starting, empty parking; ensure continuous average feed.
订阅:
博文评论 (Atom)
没有评论:
发表评论