stockyard venues and carriageways must be ground treatment and surface hardening, and meet the requirements of heavy vehicles; site should drainage facilities, drainage flow, no significant accumulation of water or crater phenomena. Site field view.
2013年8月22日星期四
Mobile mixing station is equipped with tires
1, disassembly fast, easy to move when transitions: In addition to Screw conveyor, cement silo, the entire front end down to haul mixing station
Move; Others, such as walking platform, raised panels fold down, without removing all control cables Move. Concrete mixing plant can be removed with the station away. Xin Jian special mobile mixing station is equipped with Tires, kingpins, traffic signal devices, brakes, trailer drag Allows speeds of up to 50 km / hour. Installation: Hard to be flat Of ground level; removable with a 30 ton crane. Storage: If Device is temporarily not in use, keeping the transition state transportation transportation, with two , steel cement silo and method of operation, principles with a fixed standard mixing station (reference See HZS type concrete mixing station) 3, mobile batching plant transport all components
Unit dimensions are less than the empty container size requirements, the entire station transportation needs Three 40-foot containers.
订阅:
博文评论 (Atom)
没有评论:
发表评论