unburned aerated block production line early care and cutting


After pouring into the mold conveyor early hair raising gas chambers initial setting, the room temperature is 50 ~ 70 ℃, time of 1.5-2 hours early care (based on the geographical advantages, can be removed from this process), after raising early spreader with a vacuum frame and body will die together
put the kettle hanging to the floor in advance of the cutting table. Wheel Loader the mold frame. Cutting machine that is carried on the body crosscut, slitting, milling surface Baotou, mold frame hanging back op mode manual cleaning and degreasing the car, then the car group hanging to die casting mold for the
next, after a good steel cement silo together with a crane hanging to the floor kettle kettle car stacked layers, the interlayer has four support, a number of kettle car into a group. Cutting scrap generated body by screw conveyor to cutting waste slurry mixing machine next loop machine, made by adding water waste
slurry, to be used when the ingredients.