cement paste mixer operation and use

Lever handle (20) can slide (18) driven by

stirring the pot along the column (21) of the

guide

Rails move up and down. Moves up position and

tighten the screws (19) concrete block machine be stirred,

Remove stirring the pot opposite. Look down from

the top of the blade rotation when Fang

Xiangshun

Needles. Revolution in the opposite direction.
First three switches (1K, 2K) are placed stop

position, and then time controller

Plug into the panel "programmed input" socket

and then prior to turning on the power

.
Electrical operation of both manual and

automatic
 
Auto: Set the switch to the automatic position

1K dial that automatically slow stirring 120

seconds

, Stopped 10 seconds after the alarm for 5

seconds, 120 seconds and stirring action, and

then automatically stop

. When an automatic program ends, if 1K switch

to stop, then 1K

Switch on automatically, and starts executing

the next automatic process. Each automatic

After the end of the program, you must switch to

stop 1K prevent programmable  concrete block machine after

power outage

Malfunction.
2, Manual: 1K dial the switch to the manual

position, and then the three switches set to 2K

To slow, stop, fast stop position, respectively,

to complete each action, artificial meter

Time.
Note: The three-phase power socket wiring must

ensure that the direction of the machine blade

revolution

Body of the standard in the same direction, or

vulnerable to damage stirring mechanism.