stockyard venues and carriageways must be ground treatment and surface hardening, and meet the requirements of heavy vehicles; site should drainage facilities, drainage flow, no significant accumulation of water or crater phenomena. Site field view.
2013年10月23日星期三
Same diameter concrete pipes
Concrete pipes, should be based on engineering and construction site characteristics, pouring concrete program for piping. Should shorten the length of the pipeline, less elbow and hose. Concrete Mixing Truck should ensure safe construction, easy to clean pipes, troubleshooting and disassembly repair.
In the same line, you should use the same diameter concrete pipes; together with the new, the 1st pipe, should a new tube arranged in the pressure at the pump; pipeline should be arranged smooth vertical and horizontal. Should draw piping diagrams, lists the various pipe fittings, pipe connecting ring, pipe and other specifications and quantity presented cement mixing machine. Concrete pipes should be based on the maximum size of coarse aggregate, concrete pump model, concrete output conveying distance, as well as transportation to choose the degree of difficulty. Pumping duct should be adapted to the conditions and the strength.
订阅:
博文评论 (Atom)
没有评论:
发表评论